Data Center Construction Electrical Estimator
- Hiring from
- Probably Worldwide
- Work type
- Remote
- Posted
604,419 remote jobs, straight from company career pages
100% free · New jobs every minute
Show job descriptionHide job description
Summary
Primary Responsibilities
Market Research & Analysis
-
Conduct regionally-specific market research on electrical systems, including labor availability for electrical trades, commodity trends for copper, aluminum, conduit, and switchgear, equipment lead times for long-lead items (generators, switchgear, transformers, UPS, medium-voltage gear, busway), and other factors affecting costs.
-
Maintain detailed records of historical project costs, including labor, materials, and equipment.
-
Analyze historical data to identify trends, patterns, and opportunities for cost optimization.
Conceptual Budgeting & Cost Estimation
-
Develop conceptual budgets for electrical scope elements based on market analysis and project scope.
-
Prepare detailed estimates for labor, materials, and equipment, factoring in project complexity and location.
-
Generate cost variance reports at major design milestones to track trends, inform stakeholder decisions, and identify value-engineering opportunities.
-
Lead and support takeoffs using Bluebeam, On-Screen Takeoff, LiveCount or similar tools.
-
Lead in the analysis of subcontractor, vendor, and OEM pricing for electrical distribution, generators, switchgear, UPS, medium-voltage distribution, site dry utilities, low-voltage/security, communications, and fire alarm scopes of work.
Cost Reconciliation and Change Order Support
-
Collaborate with general contractors and trade-partners to reconcile project costs and ensure scope alignment.
-
Provide support for change order forensics and perform cost reconciliation with trade-partners as needed to verify pricing accuracy.
Constructability Reviews and Value Engineering
-
Conduct thorough constructability reviews focused on electrical, medium-voltage, low-voltage, communications, and fire alarm scopes to identify potential challenges and improvements in design, including coordination of electrical systems with the building structure, mechanical systems, and architecture.
-
Work with project stakeholders to implement value-engineering solutions that optimize efficiency and cost-effectiveness.
-
Evaluate alternative materials, methods, and technologies to enhance constructability and reduce long-term maintenance expenses.
Trade Procurement & Buyout Oversight
-
Contribute electrical scope requirements and specifications to WWMC-prepared RFP documentation for general contractor (GC) procurement, ensuring clarity, accuracy, and complete scope coverage.
-
Provide review-and-assist oversight of the GC-led buyout of electrical trade partners, reviewing bid packages across electrical distribution, medium-voltage, site dry utilities, low-voltage/security, communications, and fire alarm for completeness and alignment with the project scope.
-
Review and assist with bid-leveling, analyzing trade-partner proposals to normalize pricing and identify scope gaps, exclusions, and pricing anomalies.
-
Participate in GC and trade-partner selection meetings, offering independent input on firm suitability, qualifications, and cost competitiveness.
-
Assist with pre-bid RFIs and site walks by reviewing responses and flagging issues relevant to electrical scopes.
-
Provide oversight of the GC-led post-bid interview and negotiation process, validating assumptions and confirming pricing accuracy on the owner's behalf.
-
Occasional travel to project sites for kick-offs, pre-bid walks, and constructability reviews.
Skills, Knowledge, Education, and Experience
-
5+ years of estimating experience with a strong emphasis on electrical, medium-voltage, low-voltage, communications, and fire alarm scopes in mission-critical, data center, or other heavy industrial projects.
-
Proven ability to estimate projects $50M+ in total electrical contract value.
-
Ability to perform quantity takeoffs for electrical distribution and conduit/feeders, equipment (generators and switchgear, UPS, etc), medium-voltage distribution, site dry utilities, structured cabling/low-voltage, communications, and fire alarm systems.
-
Proficiency with estimating software (Accubid, or similar) and Microsoft Excel.
-
Solid understanding of data center-specific electrical challenges, including critical power topologies, redundancy concepts, and the ability to read and interpret electrical drawings, single-line diagrams, and specifications.
-
Familiarity with electrical equipment lead times and procurement strategy for long-lead items such as generators, switchgear, transformers, UPS systems, and medium-voltage gear.
-
Ability to work independently in a fast-paced environment while collaborating with the estimating team.
Education
-
Bachelor’s degree in Construction Management, or a related field, or equivalent estimating experience in lieu of a degree.