SE
- Salary
- SAR 1.5K–SAR 1.6KSAR
- Moves you to
- France, Saudi Arabia
- Support
- Visa sponsorshipRelocation support
- Posted
- Oct 1, 2026
Is this job info correct?
Job Description
| NDT
Manpower Requirement Summary | | | | | | |
| S.No | Method / Technique | Required Manpower | Education | Job Responsibilities
(Summary) | Salary Range | Status |
| 1 | RPP Technician | 70 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Must have ARAMCO RPP
card | 1800 SAR Basic + FAT | Aramco Approved |
| 2 | RT Technician | 3 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Radiographic Testing
duties (as attached) | 1500–1600 SAR Basic +
FAT | — |
| 3 | Multi Technician | 15 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform multiple NDT
methods: UT (Shear Wave/Thickness), RT (Gamma/X-Ray), PT, MT, PAUT/TOFD (if
certified), PMI/Hardness (if qualified). Inspect welds, pipelines, pressure
vessels, tanks, structures. Equipment setup & calibration. | 1500–1600 SAR Basic +
FAT | — |
| 4 | PAUT Technician | 16 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Phased Array
UT on welds, pipes, pressure vessels, structural components. Setup PAUT
equipment, probes, wedges, scanners. Conduct calibration using IIW/V1/V2 or
project blocks. | 4000–4500 SAR Basic +
FAT | Aramco Approved |
| 5 | PMI Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Positive
Material Identification using XRF/OES on pipes, fittings, valves, plates, and
welds. | 1500–1600 SAR Basic +
FAT | — |
| 6 | UTSW Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Shear Wave UT
on welds, pipelines, pressure vessels, structural steel. Detect/sizing
defects: cracks, LOF, LOP, slag. | 3000–3500 SAR Basic +
FAT | Aramco Approved |
| 7 | Safe Rad Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Radiation safety
control during radiography. Establish controlled areas, barricades, warning
signs. Monitor radiation levels using survey meters as per
KSA/Aramco/SASO/KACST standards. | Negotiable | — |
| | | | | | | |
| | | | | | | |
| Additional Notes | | | | | | |
| | | | | | | |
| Working Hours: 8 hours × 6 days/week | | | | | | |
| Overtime: Applicable | | | | | | |
| Company Provides: Visa + Air Tickets | | | | | | |
Requirements
| NDT
Manpower Requirement Summary | | | | | | | |
| S.No | Method / Technique | Required Manpower | Education | Job Responsibilities
(Summary) | Salary Range | Status | |
| 1 | RPP Technician | 70 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Must have ARAMCO RPP
card | 1800 SAR Basic + FAT | Aramco Approved | |
| 2 | RT Technician | 3 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Radiographic Testing
duties (as attached) | 1500–1600 SAR Basic +
FAT | — | |
| 3 | Multi Technician | 15 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform multiple NDT
methods: UT (Shear Wave/Thickness), RT (Gamma/X-Ray), PT, MT, PAUT/TOFD (if
certified), PMI/Hardness (if qualified). Inspect welds, pipelines, pressure
vessels, tanks, structures. Equipment setup & calibration. | 1500–1600 SAR Basic +
FAT | — | |
| 4 | PAUT Technician | 16 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Phased Array
UT on welds, pipes, pressure vessels, structural components. Setup PAUT
equipment, probes, wedges, scanners. Conduct calibration using IIW/V1/V2 or
project blocks. | 4000–4500 SAR Basic +
FAT | Aramco Approved | |
| 5 | PMI Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Positive
Material Identification using XRF/OES on pipes, fittings, valves, plates, and
welds. | 1500–1600 SAR Basic +
FAT | — | |
| 6 | UTSW Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Shear Wave UT
on welds, pipelines, pressure vessels, structural steel. Detect/sizing
defects: cracks, LOF, LOP, slag. | 3000–3500 SAR Basic +
FAT | Aramco Approved | |
| 7 | Safe Rad Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Radiation safety
control during radiography. Establish controlled areas, barricades, warning
signs. Monitor radiation levels using survey meters as per
KSA/Aramco/SASO/KACST standards. | Negotiable | — | |
| | | | | | | | |
| | | | | | | | |
| Additional Notes | | | | | | | |
| | | | | | | | |
| Working Hours: 8 hours × 6 days/week | | | | | | | |
| Overtime: Applicable | | | | | | | |
| Company Provides: Visa + Air Tickets | | | | | | | |
| NDT
Manpower Requirement Summary | | | | | | | |
| S.No | Method / Technique | Required Manpower | Education | Job Responsibilities
(Summary) | Salary Range | Status | |
| 1 | RPP Technician | 70 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Must have ARAMCO RPP
card | 1800 SAR Basic + FAT | Aramco Approved | |
| 2 | RT Technician | 3 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Radiographic Testing
duties (as attached) | 1500–1600 SAR Basic +
FAT | — | |
| 3 | Multi Technician | 15 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform multiple NDT
methods: UT (Shear Wave/Thickness), RT (Gamma/X-Ray), PT, MT, PAUT/TOFD (if
certified), PMI/Hardness (if qualified). Inspect welds, pipelines, pressure
vessels, tanks, structures. Equipment setup & calibration. | 1500–1600 SAR Basic +
FAT | — | |
| 4 | PAUT Technician | 16 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Phased Array
UT on welds, pipes, pressure vessels, structural components. Setup PAUT
equipment, probes, wedges, scanners. Conduct calibration using IIW/V1/V2 or
project blocks. | 4000–4500 SAR Basic +
FAT | Aramco Approved | |
| 5 | PMI Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Positive
Material Identification using XRF/OES on pipes, fittings, valves, plates, and
welds. | 1500–1600 SAR Basic +
FAT | — | |
| 6 | UTSW Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Perform Shear Wave UT
on welds, pipelines, pressure vessels, structural steel. Detect/sizing
defects: cracks, LOF, LOP, slag. | 3000–3500 SAR Basic +
FAT | Aramco Approved | |
| 7 | Safe Rad Technician | 4 | Diploma Mechanical /
Bachelor’s + ASNT Level II | Radiation safety
control during radiography. Establish controlled areas, barricades, warning
signs. Monitor radiation levels using survey meters as per
KSA/Aramco/SASO/KACST standards. | Negotiable | — | |
| | | | | | | | |
| | | | | | | | |
| Additional Notes | | | | | | | |
| | | | | | | | |
| Working Hours: 8 hours × 6 days/week | | | | | | | |
| Overtime: Applicable | | | | | | | |
| Company Provides: Visa + Air Tickets | | | | | | |